Dewatering · Case study

Jor Reservoir Sediment Dewatering

Tenaga Nasional Berhad is removing built-up sediment from Jor Reservoir, part of its hydroelectric scheme near Tapah, Perak. The sediment is dredged as a slurry and pumped into geotextile tubes on land, where the water drains out through the fabric and the solids stay inside for disposal.

Jor Reservoir Sediment Dewatering site photo

What we delivered

  • Installation of GT500D dewatering geotubes in two containment cells, Cell A and Cell B
  • Geotubes laid in stacked layers inside each cell and filled with sediment slurry pumped from the reservoir
  • Every tube recorded as installed, for the main contractor Verogroup Construction

Quantities

Dewatering geotubes, Cell A (contract)6,885 m²
Dewatering geotubes, Cell B (contract)6,120 m²
Total (contract)13,005 m²

Quantities marked "contract" are contracted quantities.

Project photos

Drone photos of Jor Reservoir taken in December 2023, before the works began.