CIDB Grade G7 · ISO 9001 · 45001 · 37001
Geosynthetic installation, engineered to last.
Gateway Structure Sdn. Bhd. has installed prefabricated vertical drains, geotextiles, geotubes and reinforced walls for Malaysia's airports, highways, ports and coastline since 1994.
- Max PVD depth
- 38 m
- PVD rigs
- 38
- KLIA2 PVD
- 33M m
Trusted by Malaysia's leading owners and contractors
Solution finder
What ground problem are you solving?
Choose your challenge to see the systems we install for it.
Soft soil & settlement
Consolidate soft clay before you build: highways, airports, ports and reclamation.
Coastal & river erosion
Protect shorelines, mangroves, riverbanks and reclamation bunds.
Slopes & retaining walls
Reinforce slopes and build walls where space is tight.
Ponds, landfills & sludge
Line ponds and landfills, and dewater sludge.

About GSSB
Thirty years of geosynthetic installation
Gateway Structure Sdn. Bhd. has specialised in installing geosynthetics since 8 August 1994. Our own fleet of 38 rigs and our own crews have installed drains for KLIA2, the West Coast Expressway and Forest City, and protected coastlines from Langkawi to Johor.
With in-house technical support, we mobilise on our own schedule and keep downtime on site to a minimum.
- Ground improvement & soil reinforcement
- Slopes & walls stabilisation
- Erosion control & coastal protection
- Landfills & containment
Selected projects
Proven at national scale


37,592,000 m-run PVD
West Coast Expressway, Sections 1, 2, 3, 6 & 8
Main contractor: Gabungan Cekapbina · Mitrajaya · WCT · Ganda Imbuhan · IJM
View project
7,000,000 m-run PVD
Pengerang Independent Deepwater Petroleum Terminal
Main contractor: Penta-Ocean (Malaysia) Sdn Bhd
View project5,200,000 m-run PVD
Refinery & Petrochemical Integrated Development (RAPID)
Main contractor: Gadang Engineering Sdn Bhd

2024–2026
Jor Reservoir Sediment Dewatering
GT500D dewatering geotubes in two containment cells for sediment dredged from a TNB hydroelectric reservoir.
View project
2025–2026
Westports CT10–CT13 Reclamation
PVD for the dredging and land reclamation of new container terminals CT10 to CT13 (Phase 1).
View project
2018–2025
East Coast Rail Link (ECRL)
PVD and ground works on Sections 1, 4, 5, 6, 8 and 9, including Kuantan Port City station.
View project
2021–2024
Seri Tanjung Pinang Phase 2
PVD installed from barges, geotubes and geotextile for coastal protection, then PVD for the Phase 2B and 2C reclamation.
View projectRecognitions
Registered, rated and certified

CIDB Grade G7
Registered with the Construction Industry Development Board at Grade G7, the highest grade with no tender limit.

CIDB 3-Star SCORE (2023)
Awarded 3 Stars under CIDB's SCORE contractor capability assessment in 2023.

ISO 9001
Quality management system, certified by Certification Partner Global (JAS-ANZ accredited).

ISO 45001
Occupational health and safety management system.

ISO 37001
Anti-bribery management system.
Knowledge centre
Guides & insights
Geotextile Installation Guide for Beginners: Why You Need a Geosynthetic Installer
Geotextile installation improves soil stability, drainage, and erosion control. This beginner guide explains key steps for installing geotextile fabric and why professional geosynthetic installers ensure reliable…
How Geotextiles Improve Pavement Performance on Soft Soil
Geotextiles improve pavement performance on soft soil by reinforcing subgrades, enhancing drainage, and preventing failures like rutting and settlement, extending lifespan and reducing maintenance costs.
What Are CIDB Standards for Geosynthetic Installation?
Learn how CIDB standards ensure compliant geosynthetic installation in Malaysia through certified materials, proper installation practices, quality control, and infrastructure performance reliability.
Get a quotation
Tell us about your project
Send your drawings, soil investigation or BQ and our engineers will reply with a method, programme and price.
- 1700-81-9753
- info@gssb.com.my
- No. 42, Level 1, Jalan MR 1/3, Taman M-Residensi, 48020 Rawang, Selangor, Malaysia
What geosynthetic services does GSSB provide?
GSSB installs prefabricated vertical drains (PVD), geotextiles, geotextile tubes, sand-filled mattresses, geobags, geogrids, geowalls, modular walls, turf reinforcement mattresses, geocells and geomembrane liners, for ground improvement, erosion control, slope stabilisation and containment.
Is GSSB registered with CIDB?
Yes. Gateway Structure Sdn. Bhd. is a CIDB Grade G7 contractor, the highest grade with no tender limit, received a CIDB 3-Star SCORE rating in 2023, and is certified to ISO 9001, ISO 45001 and ISO 37001.
How deep can GSSB install PVD?
Our rigs install prefabricated vertical drains to depths of up to 38 m, on land or from barges over water, with every drain recorded by data logger.
Which countries has GSSB worked in?
Malaysia, plus projects in Singapore (Changi Airport), Taiwan (Shilin Technology Park), Bangladesh (Dhaka North Power Plant) and Indonesia (Medan Airport).
What is the difference between woven and non-woven geotextile?
Woven geotextile has high tensile strength and suits reinforcement and separation under heavy loads. Non-woven geotextile is a felt-like fabric with high permeability, better suited to drainage, filtration and erosion control.

