Aviation · Case study
Limbang & Lawas Airports
Two airport projects in northern Sarawak: the runway extension at Limbang Airport and Package 1 (earthworks, soil treatment and access road) of the new Lawas Airport at Sundar. Both sit on soft ground that must be consolidated before paving.
What we delivered
- PVD installation for the Limbang Airport runway extension (from August 2025)
- PVD and horizontal drain supply and installation for the new Lawas Airport (from October 2025)
Quantities
| New Lawas Airport PVD (contract) | 567,115 m-run |
|---|---|
| Lawas horizontal drains (contract) | 3,360 m-run |
Quantities marked "contract" are contracted quantities.